Disclosure Log
  
 Request Type:   Disclosure Classification: 

"demolition works" includes associated soft strip and asbestos

12/11/2026

Dear Sir/Madam, Under the Freedom of Information Act 2000, please provide the following information. For this request, "demolition works" includes associated soft strip and asbestos removal. 1. The name, job title and contact email address of the officer(s) or team responsible for commissioning or procuring demolition works. If you're unable to provide individual names, please provide the job title(s) and team email address. 2. Details of all demolition contracts awarded since 1 November 2023, including for each: a. a brief description of the works; b. the contract value; c. the procurement route used (e.g. open tender, framework, quotation); d. the names of the companies invited to tender or quote; e. the names of the companies that submitted a tender or quote; f. the name of the successful contractor. 3. Any frameworks or dynamic purchasing systems you currently use to procure demolition works, and when each is next due for renewal or re-tender. 4. How contractors are selected or invited to tender or quote for demolition works, both below and above your tender threshold, and whether you hold an approved contractor list for this type of work. 5. Details of any demolition works planned in the next 12 to 24 months (for example within your capital programme or property disposals). If any part of this request would exceed the cost limit, please provide what you can and let me know how I could narrow it. Please send the information by email. Kind regards,

Read response

Recruitment, New Posts and Staffing Costs Since January 2025

02/11/2026

Dear East Midlands Combined County Authority, I'm requesting information regarding staff recruitment undertaken by East Midlands Combined County Authority since 1 January 2025. I therefore require East Midlands Combined County Authority to explain how many employees have been recruited since 1 January 2025, how many of those appointments were to newly created posts rather than existing vacancies, and what additional annual staffing expenditure has resulted from the creation of those new roles. I also require East Midlands Combined County Authority to provide, for each newly created role, the job title, the department or directorate to which the role is allocated, the salary or salary band attached to the position, the date on which the post was created and whether the role is permanent, fixed-term or temporary. In addition, I require East Midlands Combined County Authority to explain the business justification for the creation of these additional posts, including whether they were established to support bus operations, active travel programmes, transport planning, mayoral functions, corporate services or any other specific programmes of work. For the avoidance of doubt, I'm not requesting the names of any individual employees or any personal information. I'm only seeking information relating to the number of appointments made, the nature of the roles, the departments in which they sit, the associated salary costs and the overall additional expenditure arising from the creation of new posts since 1 January 2025. I look forward to hearing from you within the statutory timeframe.

Read response

IT Asset Management, Procurement and IT Asset Disposal (ITAD) arrangements.

02/11/2026

I am writing to request the following recorded information under the Freedom of Information Act 2000 relating to your organisation's IT Asset Management, Procurement and IT Asset Disposal (ITAD) arrangements. 1. IT Asset Inventory Please provide the current number of: · Desktop PCs · Laptops · Tablets · Mobile phones/smartphones · Servers Where recorded, please also provide the manufacturer and model of these devices. 2. Device Refresh Please provide: · The standard refresh cycle for laptops, desktops, tablets, mobile phones and servers. · The date (or expected date) of the next planned hardware refresh programme, if recorded. · The number of devices scheduled for replacement during the next 12 months, if recorded. 3. IT Asset Disposal (ITAD) Please provide: · The name of your current ITAD supplier. · The contract award date. · The contract expiry date. · Any available extension options. · The total contract value. · Whether the contract was awarded through a procurement framework. If so, please state the framework used. 4. Hardware Procurement Please provide: · The supplier(s) of end-user devices. · Whether end-user devices are owned, leased, or supplied under a Device as a Service (DaaS) arrangement. · The procurement framework(s) used for hardware purchases, where applicable. 5. Data Destruction Please provide: · The data sanitisation standard used (for example, NIST SP 800-88), where recorded. · Whether certificates of data destruction are required. · Whether encrypted drives are securely erased or physically destroyed in accordance with your policy. 6. Sustainability Please provide: · Whether you have a policy to maximise reuse before recycling. · If recorded, the proportion or number of retired devices that are: o Reused internally o Refurbished for reuse o Recycled o Destroyed 7. Asset Disposal Volumes Please provide, for each of the last two financial years, the number of the following assets disposed of: · Desktop PCs · Laptops · Tablets · Servers · Mobile phones/smartphones 8. Contract Management Please provide: · The job title responsible for managing the ITAD contract. · The department responsible for IT asset disposal. · The expected contract review or re-tender date, if recorded. 9. Financial Recovery Please provide: · Whether your current ITAD provider offers revenue sharing or rebates for reusable equipment. · The total value of any rebates received during the last financial year, if recorded. If any of the requested information is exempt from disclosure, please provide the remaining information and identify the relevant exemption(s) under the Freedom of Information Act 2000.

Read response

Rough Sleeping Programme

30/10/2026

FOIA REQUEST FOR INFORMATION ABOUT THE ROUGH SLEEPING PROGRAMME I am writing to request information under the Freedom of Information Act 2000 about funding and spending under the government’s new Rough Sleeping Programme: https://www.gov.uk/government/publications/rough-sleeping-programme I understand the programme has allocated funds to help make an offer of support to all rough sleepers, with the initial aim of giving people a route off the streets before Christmas this year. Please provide a list of all organisations being funded to deliver frontline rough sleeping services or accommodation through the Rough Sleeping Programme by which I mean those delivering: street outreach; emergency or temporary accommodation; supported accommodation; move-on or settled accommodation; and any other services intended to support the offer of a route off the streets. For each provider, please identify: - its name - the area in which it operates - the service being provided - the amount of Rough Sleeping Programme money it has received - the period covered by that funding - if the service is providing bed spaces please state how many - where possible, an address for the accommodation site provided 2. Please also provide the available standard reporting spreadsheets or monitoring returns generated so far for MHCLG under this programme. If it is not possible to provide these documents, please provide instead: - The total amount of funding received to date under this programme for the 2026/27 financial year - The total amount of expenditure under the Rough Sleeping Programme to date - A copy of the latest delivery plan or funding strategy submitted to MHCLG If possible, I would prefer to receive any data in response to this request in a spreadsheet format (Excel or csv file). If this request triggers exemptions, I would be grateful if you could contact me as soon as possible rather than at the 20-day response limit, so that I can refine my request. Many thanks

Read response

Bus Stops Not Served by Bus Services in Derbyshire and Derby

29/10/2026

Q1: Please detail how many bus stops there are in Derbyshire, including Derby, which are not currently served by a bus

Read response

ICT and digital projects

22/10/2026

I would like to make a refined request under the Freedom of Information Act 2000 for information held by the East Midlands Combined County Authority: a list of ICT and digital projects with a value of GBP 2 million or more that are planned or in progress for 2026/27 and 2027/28, giving for each the project name, a short description, the approved budget and the job title of the responsible officer.

Read response

Brownfield Housing Fund

21/10/2026

Dear Information Governance Team, Under the Freedom of Information Act 2000, I request copies of the existing records held by the East Midlands Combined County Authority setting out the assessment and decision-making methodology used for applications to the Brownfield Housing Fund in Phases 1, 2 and 3. In particular, I seek the assessment criteria and any associated scoring or weighting framework; guidance provided to officers or assessors; minimum eligibility or funding thresholds; procedures for ranking and comparing applications; due-diligence requirements; and the arrangements for making and approving funding recommendations. I also request the final versions of any assessment framework or guidance used for these phases, together with any recorded amendments to the criteria or methodology and the records documenting the approval of those changes. I am seeking existing recorded information rather than explanations or newly compiled analysis. Where the relevant information is contained in committee papers, officer reports, guidance documents, spreadsheets or other existing records, copies of those records would be sufficient. If different methodologies applied to different phases, please provide the relevant records for each phase. If any information is withheld, please identify the specific exemption relied upon and disclose any reasonably severable material. If any part of this request is considered too broad, please provide advice and assistance under section 16 of the Act to help me narrow it.

Read response

Public Transport Access to the Peak District National Park

21/10/2026

I would like to limit the scope strictly to information held or produced by EMCCA since its establishment on 26 February 2024, and to focus on strategic, planning and partnership activity only. This should significantly reduce the breadth of material requiring review while still addressing the core purpose of the request. Specifically, please provide: 1. Strategies, plans or assessments Copies of any strategies, plans, reports or assessments produced or commissioned by EMCCA since 26 February 2024 that relate specifically to improving public transport access to the Peak District National Park. 2. Partnership working (summary level only) A summary of any partnership working undertaken by EMCCA since 26 February 2024 with any of the following organisations in relation to public transport access to the Peak District: Peak District National Park Authority Derbyshire County Council Sheffield City Council South Yorkshire Mayoral Combined Authority Local transport operators Tourism organisations I am not requesting correspondence, emails or detailed records, only headline descriptions of any meetings, joint workstreams, or collaborative activity. 3. Planned or proposed transport improvements Details of any planned or proposed public transport improvements currently under consideration by EMCCA that relate specifically to access to the Peak District, limited to: New or proposed routes Proposed increases in service frequency Seasonal or visitor‑focused services Demand‑responsive transport proposals Rail–bus integration proposals I am not requesting operational data, modelling or feasibility documents, only headline descriptions of proposals or options considered. 4. Funding Details of any funding allocated by EMCCA since 26 February 2024 for work relating to public transport access to the Peak District, including feasibility work, partnership activity or service development.

Read response

Brownfield Housing Fund

19/10/2026

Please therefore treat this email as a request for any existing application register, schedule, list, spreadsheet, database extract or equivalent record held by EMCCA identifying the applications received under the relevant Brownfield Housing Fund funding round. Where held, I would like the record to include the information identifying each application, including: • application or reference number; • applicant or developer; • scheme or site name; • location; • number of proposed homes; • funding requested; and • whether the application was successful or unsuccessful. I am not asking EMCCA to create a new database, compile new information, or undertake analysis. I am seeking the existing recorded information held by EMCCA which identifies the applications and their principal details. If the information is held across more than one existing record, I would be grateful for copies of the relevant existing records rather than requiring the information to be reformatted into a new document. For clarity, this is intended to follow the section 16 advice and assistance offered in your latest response and will allow me to identify particular applications or schemes for more focused requests concerning the underlying assessment and decision-making records. Please also confirm if EMCCA does not hold an application register or equivalent record in this form, and, if so, identify the existing record or records from which the application information is held. I look forward to receiving the information.

Read response

Funding provided for Wheeldon/ Places for People housing scheme, Langley Mill

19/10/2026

Please can you provide the following information regarding the finding granted to wheeldon/ places for people for the development on primarily greenfield land at Hall Road, Langley Mil. Derbyshire; - how much funding has been granted - what the parameters are to qualify for the funding - when the funding must be used by Many thanks

Read response

Rough sleeping, nationality data and voluntary returns of non-UK nationals (2025/26)

19/10/2026

Dear Sir/Madam, Under the Freedom of Information Act 2000, I am requesting the following information for the 2025/26 financial year (1 April 2025 to 31 March 2026). If the authority does not hold figures for 2025/26, please provide them for its most recent 12-month recording period and state the dates covered. In this request, "reconnection or voluntary return" means the supported, voluntary return of a non-UK national to a country outside the UK, where the person actually travelled. It includes: • returns recorded under other terms, such as "supported return" or "assisted return". • returns through the Home Office Voluntary Returns Service following a referral by the authority or services acting on its behalf. It excludes: • reconnection to another area within the UK. • enforced removals carried out by the Home Office. 1. How many individual people did the authority, or services acting on its behalf, see or verify as sleeping rough over the course of 2025/26? Please break this total down by nationality, using the following categories: a) UK b) EEA c) Non-EEA d) Unknown For this request: • "EEA" means nationals of EU member states, Iceland, Liechtenstein, Norway and Switzerland. • "Non-EEA" means nationals of all other countries outside the UK and the EEA (rest of world). • Each person should be counted in one category only. Please count each person once if they were seen or verified as sleeping rough on at least one occasion during the year. If the authority does not record nationality in these categories, please give the figures in whatever categories it does use, and explain what each one covers. I would rather receive the data in the authority's own categories than have this part of the request refused or answered as not held. 2. During 2025/26, how many services that the authority ran, commissioned or funded for people sleeping rough offered support to non-UK nationals to reconnect or return voluntarily? For this request, the following should be included: • any service where reconnection or voluntary return is offered, even if that is not its main purpose. • services delivered in-house, commissioned from an external provider, funded through a grant, or commissioned jointly with other authorities. 3. How many individual non-UK nationals who had been sleeping rough in the authority's area returned to a country outside the UK during 2025/26 through reconnection or voluntary return? Please count only returns supported through services that the authority ran, commissioned or funded. Please break this figure down using the categories in question 1: a) EEA b) Non-EEA c) Unknown Please count: • returns where the person actually travelled, not referrals or offers. • each person once, even if they returned more than once during the year. If the authority records referrals or offers but does not record whether a return took place, please say so and provide the number of referrals or offers. If the authority records nationality in different categories, please give the figures in those categories instead, as set out in question 1. Please give exact figures throughout. Only if the authority considers that a particular figure would identify someone, please give that figure as "fewer than 5" rather than withholding it or the rest of the response. If any of this information has already been published, please send me a link to where it can be found. If answering any part of this request would exceed the cost limit under section 12, please answer the parts you can within the limit, and tell me which part exceeded it. If the authority does not hold information for any part of this request, please say so explicitly for that part. Thank you for your help. I look forward to your response within the statutory 20 working days. Yours faithfully,

Read response

ICT, network and telephony contracts

13/10/2026

Dear Freedom of Information team, Under the Freedom of Information Act 2000 I would like to request the following information held by East Midlands Combined County Authority. A list of current contracts for ICT services, network and connectivity, telephony and unified communications, data centre or hosting, enterprise software (finance, HR, housing, social care or similar) and programme or project management services. For each contract please give the supplier name, a short description, the start date, the end date, any extension options, the annual or total value and the job title of the contract owner. If this information is published in the organisation's contracts register under the Local Government Transparency Code, a link to the current register is a complete answer. If the request would exceed the appropriate cost limit, please limit it to contracts with an annual value over GBP 50,000 or tell me how to narrow it. I would prefer to receive the response by email as a spreadsheet. Dear Freedom of Information team, Under the Freedom of Information Act 2000 I would like to request the following information held by East Midlands Combined County Authority. A list of current contracts for ICT services, network and connectivity, telephony and unified communications, data centre or hosting, enterprise software (finance, HR, housing, social care or similar) and programme or project management services. For each contract please give the supplier name, a short description, the start date, the end date, any extension options, the annual or total value and the job title of the contract owner. If this information is published in the organisation's contracts register under the Local Government Transparency Code, a link to the current register is a complete answer. If the request would exceed the appropriate cost limit, please limit it to contracts with an annual value over GBP 50,000 or tell me how to narrow it. I would prefer to receive the response by email

Read response

Request for transaction spend data over £500.

09/10/2026

Thank you for your commitment to publishing spend data in support of procurement transparency, which strengthens trust and accountability in the public sector. Oxygen Insights processes this data, alongside information from other public bodies, to provide a clear picture of public sector spend. It helps buyers share best practice and make smarter use of funds, creates new opportunities for suppliers to work with the public sector, and supports the estimation of Scope 3 carbon emissions, which public bodies use to plan and deliver their CO2 reduction goals. To build the most complete picture, we kindly request your transparency data, under the Freedom of Information Act 2000, for all transactions over £500 for the following period: April 2026 onwards Please provide the data in CSV format, including the date, value, and recipient of each transaction, along with the procurement category or description. If preferred, please upload this information to your website and kindly advise us when complete so that we can access it. By sharing this information, you will be directly supporting better procurement outcomes for your public sector colleagues. If you would like further information on Oxygen Insights please see the link to our website below, or feel free to email us to arrange a call. Thank you for your time and assistance.

Read response

.Request for ZEBRA funding and project information.

08/10/2026

Dear East Midlands Combined County Authority, Please treat this as a request under the Freedom of Information Act 2000. My questions concern the zero emission buses funded through the Department for Transport's Zero Emission Bus Regional Areas (ZEBRA) programme. This request follows correspondence with Derbyshire County Council, which advised on 27 August 2026 that responsibility for public transport has transferred to the East Midlands Combined County Authority and that it no longer holds the information sought. 1. How many zero emission buses has the authority funded under the ZEBRA programme, and how many of those have entered passenger service? 2. At each depot where those buses are based, has a permanent grid connection for charging been energised? Where it has, please give the date it was energised. Where it has not, please give the date energisation is currently expected. 3. Has the authority, or any operator on the authority's behalf, used diesel or HVO generators to charge any of those buses, and if so at which depots and between which dates? 4. Please provide the total amount paid for the hire, purchase, fuelling or running of any such generators, both by the authority itself and, where this has been reported to the authority, by the operator. Where the authority holds this information because an operator has reported it, please provide it on that basis and say so. If any part of this request relates to buses funded before the transfer of responsibility from Derbyshire County Council, and that historic information has not transferred to the East Midlands Combined County Authority, please advise which body does hold it.

Read response

ESOL Allocation and Delivery

08/10/2026

Hello, This is a request for information under the Freedom of Information Act 2000, please. Please can you tell me: 1. Your authority's total expenditure - from adult skills fund funding only - on English for Speakers of Other Languages (ESOL) delivery in the 2025/26 academic year. 2. If the total expenditure for this financial year is not yet finalised, please tell me your authority's predicted total expenditure - using adult skills fund funding only - on ESOL delivery in the 2025/26 academic year. 3. Please tell me how much adult skills fund funding was allocated by your authority to providers for the purposes of delivering ESOL in the 2025/26 academic year. For the avoidance of doubt, I am only interested in data on adult skills fund (ASF) funded ESOL expenditure by your authority.

Read response

Cross‑boundary bus services under EMCCA EP and SYMCA Franchising

06/10/2026

Dear Sir / Madam, Under the Freedom of Information Act 2000, I request the following limited information relating to cross boundary bus services operating between the East Midlands Combined County Authority (EMCCA) area and South Yorkshire, and any planned changes arising from EMCCA’s Enhanced Partnership arrangements and the introduction of bus franchising in South Yorkshire. 1. Cross boundary services Please provide a headline summary of EMCCA’s current position on cross boundary bus services, limited to: • Whether EMCCA intends to retain, alter, expand, or reduce cross boundary routes under its Enhanced Partnership • Any headline principles agreed with neighbouring authorities (including SYMCA) regarding cross boundary operations (No detailed route specifications or timetables are requested.) 2. Interaction with SYMCA franchising Please provide a summary of any expected changes to cross boundary services arising from the introduction of franchising in South Yorkshire, limited to: • Whether EMCCA anticipates any operational, contractual, or funding implications for services entering or leaving the EMCCA area • Any headline changes to governance or service standards for cross boundary routes • Any planned changes to ticketing or fare integration affecting cross boundary journeys (No detailed contractual clauses or financial breakdowns are requested.) 3. Enhanced Partnership requirements Please confirm: • Whether operators running cross boundary services will be required to meet EMCCA Enhanced Partnership standards when operating within the EMCCA area • Whether any reciprocal requirements have been discussed or agreed with SYMCA (Only headline compliance requirements are requested.) 4. Joint planning and coordination Please provide: • Any headline information on joint planning, coordination, or discussions between EMCCA and SYMCA regarding cross boundary bus links • Whether any formal agreements or protocols have been established (No internal emails or detailed partnership documents are requested.) 5. Future service planning Please provide: • Any headline assessments of potential changes to cross boundary demand under EMCCA’s Enhanced Partnership • Any planned mitigation measures to ensure continuity of cross boundary links (No modelling data or detailed demand forecasts are requested.) If any part of this request exceeds the cost limit under Section 12 of the FOI Act, please advise how the scope may be refined further. I look forward to your response within the statutory 20 working days.

Read response

Cross‑boundary bus services under EMCCA EP and SYMCA Franchising

02/10/2026

Dear Sir / Madam, Under the Freedom of Information Act 2000, I request the following limited information relating to cross boundary bus services operating between the East Midlands Combined County Authority (EMCCA) area and South Yorkshire, and any planned changes arising from EMCCA’s Enhanced Partnership arrangements and the introduction of bus franchising in South Yorkshire. 1. Cross boundary services Please provide a headline summary of EMCCA’s current position on cross boundary bus services, limited to: • Whether EMCCA intends to retain, alter, expand, or reduce cross boundary routes under its Enhanced Partnership • Any headline principles agreed with neighbouring authorities (including SYMCA) regarding cross boundary operations (No detailed route specifications or timetables are requested.) 2. Interaction with SYMCA franchising Please provide a summary of any expected changes to cross boundary services arising from the introduction of franchising in South Yorkshire, limited to: • Whether EMCCA anticipates any operational, contractual, or funding implications for services entering or leaving the EMCCA area • Any headline changes to governance or service standards for cross boundary routes • Any planned changes to ticketing or fare integration affecting cross boundary journeys (No detailed contractual clauses or financial breakdowns are requested.) 3. Enhanced Partnership requirements Please confirm: • Whether operators running cross boundary services will be required to meet EMCCA Enhanced Partnership standards when operating within the EMCCA area • Whether any reciprocal requirements have been discussed or agreed with SYMCA (Only headline compliance requirements are requested.) 4. Joint planning and coordination Please provide: • Any headline information on joint planning, coordination, or discussions between EMCCA and SYMCA regarding cross boundary bus links • Whether any formal agreements or protocols have been established (No internal emails or detailed

Read response

Route 40 City Hospital patronage data and EMCCA funding decision

02/10/2026

Dear East Midlands Combined County Authority, Please treat this as a request for recorded information under the Freedom of Information Act 2000. Nottingham City Transport has now told me that: - approximately 50 passengers per day travelled to City Hospital on Service 40; - this represented approximately three passengers per hour; - its more detailed patronage data was supplied to the relevant transport authorities before the June service changes; and - EMCCA reviewed the patronage and decided that funding continuation of the 40 to City Hospital was not a valuable use of limited resources. I would therefore like the recorded evidence held by EMCCA behind that decision. Please provide: 1. The patronage information supplied to EMCCA concerning the City Hospital section of Service 40/40A. 2. Any breakdown supplied by journey, time period or stop. 3. Any costing supplied for retaining the City Hospital section. 4. The amount of funding EMCCA was asked to provide, if any. 5. Any alternative service options considered, including reduced-frequency or selected-journey options. 6. Any officer briefing, appraisal, email, decision record, meeting note or other recorded assessment in which EMCCA considered whether to fund the service. 7. The date the decision was made and the officer, board or other decision-maker responsible. 8. Any value-for-money calculation or criteria used in reaching the conclusion that approximately 50 passengers per day did not justify funding. 9. Any equality or accessibility assessment considered in relation to removal of the direct City Hospital service. 10. Any recorded criteria for subsequently reconsidering or restoring funding. I am requesting existing recorded information and documents rather than asking EMCCA to undertake new analysis. NCT has described its detailed patronage information as commercially sensitive. If EMCCA considers any requested information exempt under section 43 or another provision, please identify the information withheld, the specific exemption relied upon, the prejudice envisaged and, where applicable, the public-interest considerations. Where partial disclosure is possible, please provide the remainder rather than withholding a document in its entirety.

Read response
































Page 1 of 1 18 Records